1. Home
  2. BCS
  3. ISEB-PM1 Exam Syllabus

BCS ISEB-PM1 Exam Topics

BCS ISEB-PM1 Exam Overview :

Exam Name: BCS Foundation Certificate in IS Project Management
Exam Code: ISEB-PM1
Certifications: BCS Project and Programme Management Certification
Actual Exam Duration: 90 minutes
Expected no. of Questions in Actual Exam: 40
See Expected Questions: BCS ISEB-PM1 Expected Questions in Actual Exam

BCS ISEB-PM1 Exam Objectives :

Section Objectives
1. Projects and Project Work (3 hours)
  • The definition of projects, as opposed to other types of work
  • Terms of reference for a project
  • The purpose of project planning and control
  • The typical activities in a system development life-cycle
  • System and project life cycles
  • Variations on the conventional project life cycle, such as the use of prototypes or an iterative approach (e.g. the creation and testing of a series of versions of a product that converge on the final deliverable) or incremental approach (i.e. the phased creation and delivery of a series of products to users)
  • Implementation strategies e.g. parallel running, ‘sudden death’, use of pilots
  • Purpose and content of business case reports; the use and significance of discounted cash flows in such reports (Note: knowledge of the method of calculation is NOT required)
  • Types of planning document: project initiation documents; project and stage plans, quality plan, communications plan, risk plan
  • Post implementation review
2. Project Planning (3 hours) Note: candidates are expected to have an understanding of both the product and activity based approaches to planning
  • Project deliverables and intermediate products
  • Work and product breakdowns
  • Product definitions (including the identification of derived from, and component of relationships between products)
  • Relationship between products and activities in a project
  • Check points and milestones
  • Lapsed time and effort required for activities
  • Activity networks (using ‘activity on node’ notation)
  • Calculation of earliest and latest start and end dates of activities and resulting float
  • Identification and significance of critical paths
  • Resource allocation, smoothing and levelling, including the use of resource histograms
  • Work schedules and Gantt charts
3. Monitoring and Control (2 hours)
  • The project control life cycle: including planning, monitoring achievement, identifying variances, taking corrective action
  • The nature of, and the purposes for which, information is gathered
  • Collecting progress information
          - Timesheets,
          - Team progress meetings
          - Error and change reports etc
  • Presenting progress information
          - Content of progress reports
          - Graphical presentation of progress information e.g. accumulative resource charts (also known as S-curve charts)
          - Use of earned value analysis, including where it would be applied in project life-cycle (Note: it is not expected that candidates be able to calculate and interpret earned value figures)
  • The reporting cycle
          - Reporting structures in projects
          - Timing, personnel and purpose of different types of reporting meetings
  • Corrective action
          - Tolerance and contingency
          - Exception reports and plans
          - Management procedures involved in changing plans
          - Options, including extending or staggering deadlines, increasing resources, reducing Functionality or quality requirements, cancelling the project etc.
4. Change Control and Configuration Management (1 hour)
  • Reasons for change and configuration management
  • Change control procedures
         - Role of change control boards
         - Generation of change requests
         - Change request evaluation (e.g. its impact on the business case)
         - Change request authorisation
  • Configuration management
          - Purpose and procedures
          - Identification of configuration items
          - Product baselines
          - Configuration management databases: content and use
5. Quality (2 hours)
  • Definitions of the term ‘quality’ e.g. ‘fitness for purpose’
  • Quality control versus quality assurance
  • Defining quality: definition and measurement
  • Detection of defects during the project life cycle
  • Quality procedures: entry, process and exit requirements
  • Defect removal processes, including testing and reviews
  • Types of testing (including unit, integration, user acceptance, and regression testing)
  • The inspection process, peer reviews
  • Principles of IS0 9001:2000 quality management systems
  • Supplier evaluation
6. Estimating (2 hours)
  • Effects of over and under-estimating
  • Effort versus duration; relationship between effort and cost
  • Estimates versus targets
  • Use of expert judgement (advantages and disadvantages)
  • The Delphi approach
  • Top-down estimating
          - Identification of size drivers (e.g. function points etc)
          - Identification of productivity rates (e.g. function points per day)
          - Need for past project data to establish productivity rates
          - Factors affecting productivity rates (e.g. staff experience)
          - Estimation of effort for new projects using productivity rates and size drivers
  • Bottom up approaches to estimating
  • Use of analogy in estimating
7. Risk (2 hours)
  • Definition of the term ‘risk’; components of risk: risk events (or triggers), probability, impact
  • Ways of categorising risk, e.g. business versus project
  • Identification and prioritisation of risk
  • Assessment of risk exposure (i.e. combining consideration of potential damage and probability of loss)
  • Risk responses and actions: risk prevention, reduction, acceptance, transfer and contingency planning
  • Typical risks associated with information systems development
  • Assessment of the costs/benefits of risk reduction activities
  • Maintenance of risk registers and risk logs
8. Project Communications and Project Organisation (3 hours)
  • Relationship between programmes and projects
  • Identifying stakeholders and their concerns
  • The project sponsor
  • Establishment of the project authority (e.g. project board, steering committee etc.)
  • Membership of project board/steering committee
  • Roles and responsibilities of project board, project manager, stage manager, team leader
  • Desirable characteristics of project manager
  • Role of project support office
  • The project team and matrix management
  • Reporting structures and responsibilities
  • Management styles and communication (including same time/same place; same time/different place, different time/same place, different time/different place)
  • Team building (including phases of team cohesion e.g. forming, storming, norming, performing, adjourning)
  • Team dynamics
Official Information https://www.bcs.org/qualifications-and-certifications/certifications-for-professionals/project-programme-management-certifications/bcs-foundation-certificate-in-is-project-management/

Updates in the BCS ISEB-PM1 Exam Topics:

BCS ISEB-PM1 exam questions and practice test are the best ways to get fully prepared. Study4exam's trusted preparation material consists of both practice questions and practice test. To pass the actual  Project and Programme Management ISEB-PM1  exam on the first attempt, you need to put in hard work on these questions as they cover all updated  BCS ISEB-PM1 exam topics included in the official syllabus. Besides studying actual questions, you should take the  BCS ISEB-PM1 practice test for self-assessment and actual exam simulation. Revise actual exam questions and remove your mistakes with the BCS Foundation Certificate in IS Project Management ISEB-PM1 exam practice test. Online and Windows-based formats of the ISEB-PM1 exam practice test are available for self-assessment.