Free CTFL-PT_D Exam Questions - iSQI CTFL-PT_D Exam
ISTQB Certified Tester Foundation Level - Specialist Performance Testing
Total Questions: 40iSQI CTFL-PT_D Exam - Prepare from Latest, Not Redundant Questions!
Many candidates desire to prepare their iSQI CTFL-PT_D exam with the help of only updated and relevant study material. But during their research, they usually waste most of their valuable time with information that is either not relevant or outdated. Study4Exam has a fantastic team of subject-matter experts that make sure you always get the most up-to-date preparatory material. Whenever there is a change in the syllabus of the ISTQB Certified Tester Foundation Level - Specialist Performance Testing exam, our team of experts updates CTFL-PT_D questions and eliminates outdated questions. In this way, we save you money and time.
iSQI CTFL-PT_D Exam Sample Questions:
Identify the correspondences between the different tools (listed from 1 to 3) and their objectives and characteristics (listed from A to F).
1. Load generator.
2. Load management console.
3. Monitoring tool.
1. It monitors, records and/or analyzes the behavior of the component or system under test.
2. It creates the load and also collects the metrics for later communication.
3. It provides the control to start and stop the creation and execution of the user simulation.
4. It aggregates metrics from the various transactions that are defined within the load instances
5. It creates and runs multiple client instances that simulate user behavior.
6. It can effectively support a root cause analysis of performance in a system under test.
SELECT ONE OPTION
Select the ONE option that describes the mechanism used to extract metrics associated with deadlocks and multi threading problems
SELECT ONE OPTION
What are the main activities of performance test execution?
1. Monitoring all parts of the environment.
2. Setting up the load generation and monitoring tools.
3. Collecting and keeping all results and information related to the test.
4. Generation of a load against the SUT according to a load profile.
5. Parameterize the test scripts.
6. Setting up the system under test.
SELECT ONE OPTION
Which ONE of the following mechanisms is used to make the load test represent a load situation in a real production environment?
SELECT ONE OPTION
Which ONE of the following options is NOT an advantage of aggregating results from performance testing?
SELECT ONE OPTION
Currently there are no comments in this discussion, be the first to comment!