Free NCS-Core Exam Questions - Nutanix NCS-Core Exam
Nutanix Certified Services Core Infrastructure Professional
Total Questions: 302Nutanix NCS-Core Exam - Prepare from Latest, Not Redundant Questions!
Many candidates desire to prepare their Nutanix NCS-Core exam with the help of only updated and relevant study material. But during their research, they usually waste most of their valuable time with information that is either not relevant or outdated. Study4Exam has a fantastic team of subject-matter experts that make sure you always get the most up-to-date preparatory material. Whenever there is a change in the syllabus of the Nutanix Certified Services Core Infrastructure Professional exam, our team of experts updates NCS-Core questions and eliminates outdated questions. In this way, we save you money and time.
Nutanix NCS-Core Exam Sample Questions:
After installation, network ports are properly configured with the default active-backup bonding.
One 10GbE port goes to switch 1. Another 10GbE port goes to switch 2. A consultant tests failover by manually pulling one of the cables and notices it is taking too much time to failover, which is causing excessive packet loss.
What should the consultant enable to resolve this issue?
After finishing foundation on an AHV cluster, a consultant is preparing to plug into the customer network given the following set of requirements:
* All network traffic on trunks is tagged
* Customer is using LACP
* A native VLAN is not in use
Which set of commands should the consultant use to ensure cluster connectivity on customer equipment?
A consultant configures a Nutanix cluster and integrates the hosts into vCenter using VMware best practices. The customer has requested that the Nutanix cluster only have a single datastore.
Upon configuring the cluster per the customer requirements, vCenter displays an alert regarding the heartbeat datastore. The consultant adds the das.ignoreInsufficientHbDatastore value = true rule. The container can be seen from each host, but the alert remains active.
What should the consultant do to resolve this issue?
A customer racks all nodes in the new cluster. The customer does not allow IPv6 for node discovery.
The consultant is not allowed to use the consultant's own flat switch in the customer's environment.
Which step should the consultant take to resolve this issue?
A consultant successfully completes a Foundation using a flat switch. The consultant then works with the customer to move the cluster over to their production network. After the move, the CVMs and hypervisors can no longer communicate, which prevents the cluster from starting.
Which option should be used to resolve this issue?