Many candidates desire to prepare their PMI-PBA exam with the help of only updated and relevant study material. But during their research, they usually waste most of their valuable time with information that is either not relevant or outdated. Study4Exam has a fantastic team of subject-matter experts that make sure you always get the most up-to-date preparatory material. Whenever there is a change in the syllabus of the PMI Professional in Business Analysis exam, our team of experts updates PMI-PBA questions and eliminates outdated questions. In this way, we save you money and time.
PMI PMI-PBA Exam Sample Questions:
After conducting a brainstorming session with a group of project participants, the business analyst feels that the elicited requirements are biased Which tool or technique could be used to gain an objective, first-hand insight into tasks and activities that are difficult to describe?
The requirements traceability matrix should primarily be used to:
A business analyst has been assigned to a project that will design and build two new bridges and. at the same time, redesign a failing bridge for a local structural engineering company. All three bridges must be constructed and meet all safety requirements before flood season next spring.
How would the business analyst define the scope of this project?
A business analyst is discussing the acceptance criteria for a new measurement system with the operations manager The operations manager is particularly concerned about the accuracy of the new system because mistakes in data measurements could be extremely costly to fix.
Which of the following is the best strategy to define the appropriate acceptance criteria?
The project team has all the document control process and versioning in place to capture the requirements changes. The team ensures that the change is documented in the scope document, resulting in the changed work breakdown schedule (WBS) and schedule. However, a key requirement was not implemented in the release
Which is a possible reason why the requirement was not implemented?