1. Home
  2. VEEAM
  3. VMCE_v12 Exam Questions

Free VMCE_v12 Exam Questions - VEEAM VMCE_v12 Exam

VEEAM VMCE_v12 Exam

Veeam Certified Engineer v12

Total Questions: 109

VEEAM VMCE_v12 Exam - Prepare from Latest, Not Redundant Questions!

Many candidates desire to prepare their VEEAM VMCE_v12 exam with the help of only updated and relevant study material. But during their research, they usually waste most of their valuable time with information that is either not relevant or outdated. Study4Exam has a fantastic team of subject-matter experts that make sure you always get the most up-to-date preparatory material. Whenever there is a change in the syllabus of the Veeam Certified Engineer v12 exam, our team of experts updates VMCE_v12 questions and eliminates outdated questions. In this way, we save you money and time.

VEEAM VMCE_v12 Exam Sample Questions:

Q1.

An engineer needs to test the impact of operating system updates on app functionality in an isolated non-production environment.

What Veeam Backup and Replication feature can be used to facilitate this?

Q2.

A physical Linux server protected by a centrally managed Veeam agent is physically damaged. A VMware vSphere infrastructure is available, and the physical server is eligible for virtualization. Which recovery step provides the lowest possible RTO?

Q3.

A customer's NAS has multiple hardware failures, and the NAS is no longer accessible. All of the users are impacted as they need to access the NAS for day-to-day work.

Which restore method could minimize the service impact to the users?

Q4.

A Microsoft SQL server is running in a VMware VM. The VM is very sensitive to snapshots, and can only be snapshotted once per day at 3 AM. However, the RPO for the databases running inside the VM is 1 hour.

Which two Application-Aware Processing Settings should be selected in the backup job so that the 1 hour RPO for the databases is met? (Choose two.)

Q5.

The engineer configured Veeam Backup & Replications 3 years ago with an all-in-one physical server with one job backing up all VMs. The environment grew considerably and RPOs are no longer met.

The engineer checks the backup job and sees:

Load: Source 0% > Proxy 68% > Network 0% > Target 0%.

What should be done to decrease the backup processing time?

Solutions:
Question: 1 Answer: C
Question: 2 Answer: A
Question: 3 Answer: B
Question: 4 Answer: A, E
Question: 5 Answer: C
Disscuss VEEAM VMCE_v12 Topics, Questions or Ask Anything Related

Currently there are no comments in this discussion, be the first to comment!